首页> 美国政府科技报告 >Bus-Actuated Traffic Signals-Initial Assessment of Part of the Swansea Bus Priority Scheme
【24h】

Bus-Actuated Traffic Signals-Initial Assessment of Part of the Swansea Bus Priority Scheme

机译:公交车交通信号 - 斯旺西公交优先方案部分初步评估

获取原文

摘要

Early in 1978 West Glamorgan County Council introduced a scheme for giving buses priority in Central Swansea. Using selective detection (SD) equipment, buses approaching traffic signals are detected separately from other vehicles and the signal operation may then be modified to reduce their delay. Part of the network was studied comprising a route passing through 6 intersections and one Pelican crossing, all equipped with SD facilities. Surveys were carried out with and without the priority in operation. Over the length of the route studied, buses equipped for gaining priority saved an average of nearly 40 seconds with some gains in regularity. Other vehicles lost an average of nearly 2 seconds each time they passed through a signal. Theoretical estimates suggest that pedestrians waited at signal-controlled crossing places for an extra 1 second with priority. Overall, priority saved bus occupants about 40 person-hours but lost other vehicle occupants and pedestrians about 90 person-hours over an average 10-hour day. About 60 per cent of the benefits and 80 percent of the disbenefits occurred at one double-junction where, since the survey, changes have been made to signal settings to limit the disbenefit to other traffic. There are also unquantified factors which tend to redress the balance. (Copyright (c) Crown Copyright 1980.)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号