首页> 美国政府科技报告 >A Comparative Analysis of the Life Cycle Costs of Compliance Coal Versus Noncompliance Coal with Regenerable FGD Equipment at Brandon Shores Units 1 and 2. Volume 1
【24h】

A Comparative Analysis of the Life Cycle Costs of Compliance Coal Versus Noncompliance Coal with Regenerable FGD Equipment at Brandon Shores Units 1 and 2. Volume 1

机译:布兰登海岸1号和2号单元符合性煤与不合格煤与可再生FGD设备的生命周期成本对比分析第1卷

获取原文

摘要

The relative costs of burning compliance coal and high sulfur coal with sulfur oxide removal are compared for the Brandon Shores Power Plant. Because of the plant's location next to potential markets for sulfur, sulfuric acid, and gypsum, only regenerable scrubbers were considered. The marketability of these products was surveyed and costs of coal and capital equipment were projected. For this plant, it was found that unless a highly optimistic scenario was adopted, compliance coal was the preferred option. The review of markets may be useful for comparison with non-regenerable scrubbers for new plants where scrubbers are required.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号