首页> 美国政府科技报告 >Evaluating the Net Cost Per Job of the 1977 Economic Stimulus Package
【24h】

Evaluating the Net Cost Per Job of the 1977 Economic Stimulus Package

机译:评估1977年经济刺激计划的每份工作净成本

获取原文

摘要

The purpose of this study is to access to net cost per job of various programs included in the 1977 Economic Stimulus Package using a consistent methodology for each program. This package consists of a Public Works Program, a Public Service Employment Program, Anti-Recessionary Fiscal Assistance (countercyclical revenue sharing), an Employment Tax Credit, and a tax cut. In order to find the net cost per job for public works, public service employment and countercyclical revenue sharing, the following methodology was used: (1) Estimating direct employment per billion dollars; (2) Estimating secondary employment per billion dollars; (3) Estimating the percentage of federal funds that displaced local funds and reducing the number of jobs obtained in (1) and (2) by that percentage; (4) Determining the use of displaced funds; (5) Estimating the jobs created by the displaced funds and adding those to (3); and (6) Determining the recaptures to the Treasury and reducing the cost per billion by that amount.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号