Preliminary Survey Report: Plating Shop, American Airlines, Maintenance and Engineering Center, Tulsa International Airport, Tulsa, Oklahoma, July 1, 1981

机译:初步调查报告:电镀车间,美国航空公司,维护和工程中心,塔尔萨国际机场,俄克拉荷马州塔尔萨,1981年7月1日

获取原文

摘要

A visit was made to the Plating Shop of the American Airlines Maintenance and Engineering Center, Tulsa, Oklahoma in order to evaluate control methods in place at this facility. The plating shop was a separate room within a larger building. The tanks were set on concrete pedestals built up from the concrete ventilation duct tunnels which run underneath each line. Grit blasting and shot peening were performed in another area. There were three hard chrome lines with a total of 22 plating tanks. One line contained electroless nickel and copper plating tanks, and the cadmium for the nickel/cadmium process. There was a nickel line with four plating tanks and a cadmium line. Twenty-eight workers were employed at the time of this visit in the plating shop including two machinists. Work practices includes draining and rinsing pieces over the plating tanks. Gloves were worn when removing pieces from the acid dip and plating tanks, and the workers wore face shields when working around the nitric-acid (7697372) tank. The author concludes that the ventilation system worked exceptionally well. The author recommends that this facility be included in an in-depth evaluation of safety and control measures in the plating industry.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号