首页> 美国政府科技报告 >Extended System Operations Studies for Automated Guideway Transit Systems: Plan for Task 5--DPM Failure Management
【24h】

Extended System Operations Studies for Automated Guideway Transit Systems: Plan for Task 5--DPM Failure Management

机译:自动导轨运输系统的扩展系统运行研究:任务5计划 - Dpm故障管理

获取原文

摘要

The purpose of Task 5 in the Extended System Operations Studies Project, DPM Failure Management, is to enhance the capabilities of the Downtown People Mover Simulation (DPMS) and the Discrete Event Simulation Model (DESM) by increasing the failure modeling detail of these processors so that a variety of failure management strategies can be evaluated in terms of total vehicle and passenger delay. The purposes of this planning document are to list the major failure management strategies that are currently being considered in engineering studies of DPMs and to propose software modifications, in functional terms, and analysis techniques that will permit modeling of as many of these strategies as possible.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号