首页> 美国政府科技报告 >Well Control in Case of Offshore Blowout: Pump Mud from the Surface through the Drill Pipe and Back through the Annulus (Central Annulus Killing System)
【24h】

Well Control in Case of Offshore Blowout: Pump Mud from the Surface through the Drill Pipe and Back through the Annulus (Central Annulus Killing System)

机译:海上井喷情况下的井控:从地面通过钻杆泵送泥浆并返回环空(中央环空杀伤系统)

获取原文

摘要

Pumping mud from the surface is often used to stop blowout. Production phase blowout can with high probability be controlled by a new method based on pumping mud from a central system into the well via annulus. A feasibility study is recommended. Blowout can often be stopped if the well can be entered with drill pipe through which mud can be pumped. Several worth-while ideas aimed at facilitating this operation have been identified and recommended for further study.