首页> 美国政府科技报告 >Large-Scale Production of the M1 Tank Should Be Delayed Until Its Power Train Is Made More Durable
【24h】

Large-Scale Production of the M1 Tank Should Be Delayed Until Its Power Train Is Made More Durable

机译:m1坦克的大规模生产应该延迟,直到它的动力传动系更耐用

获取原文

摘要

The Army has requested funds to procure 720 M1 tanks in fiscal year 1982. Although the tank has met virtually all of its major combat requirements, the tank's power train durability must be improved so that the tank's performance can measure up to its full potential. Until this is done, it would be unwise to produce the M1 in large numbers. To do so would merely increase the inventory of tanks hampered by engines requiring frequent replacement and costly maintenance. Other tank components also required frequent maintenance during testing. Whether this was generally a correctable problem of poor quality control at contractor plants, as the Army contends, or whether it will become a chronic problem remains to be seen.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号