首页> 美国政府科技报告 >Kielder Aqueduct Tunnels - Predicted and Actual Geology
【24h】

Kielder Aqueduct Tunnels - Predicted and Actual Geology

机译:基尔德渡槽隧道 - 预测和实际地质

获取原文

摘要

The Kielder tunnels are part of the Northumbrian Water Authority's Kielder Water Scheme and constitute the major element of an aqueduct linking the rivers Tyne, Wear and Tees. The 32 km length of hard rock tunnel traverses a varied sequence of sedimentary Carboniferous strata with limited occurrences of intrusive igneous rocks. Full-face tunnel boring machines were used for most of the tunnel length, with shorter sections being driven using drill-and-blast methods and a roadheader. The report describes the site investigations undertaken and how the information gained was used to assess the suitability of alternative excavation and support methods. Conditions encountered during construction are compared with predictions derived from site investigations; discrepancies are discussed and means whereby these might have been reduced are considered with the intention of facilitating good future site investigation practice. (Copyright (c) Crown Copyright 1981.)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号