Evaluation of the Limestone Dual Alkali Prototype System Plant Scholz: System Design and Program Plan

机译:石灰石双碱原型系统工厂scholz的评价:系统设计和程序计划

获取原文

摘要

The report describes the (Phase I) design of both a limestone dual alkali system at Gulf Power Co.'s Scholz steam plant and a related test program. The limestone dual alkali process will be tested at an existing 20 MWe prototype facility at the Scholz plant. The intent of the project is not only to demonstrate the technical feasibility of the process at a prototype level but also to supply technical and cost information related to the implementation of the process at a full commercial scale. The project is being carried out in three phases: Phase I, project planning; Phase II, procurement, recommissioning, and construction; and Phase III, startup, teating, decommissioning, and data analysis. Recommissioning costs at Scholz were about $800,000. Capital and operating costs (in 1979 dollars) projected for a new 500 MW limestone dual alkali system based on the prototype experience are estimated to be $95/kW and 4.5 mills/kWh, respectively. The process was developed by Combustion Equipment Associates, Inc. and Arthur D. Little, Inc.; CEA's Air Pollution Division was sold to Thyssen-CEA Environmental Systems, Inc. in late 1980.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号