首页> 美国政府科技报告 >Hydrologic Flow Determination for Hydropower Feasibility Analysis
【24h】

Hydrologic Flow Determination for Hydropower Feasibility Analysis

机译:水电可行性分析的水文流量确定

获取原文

摘要

A study was made of methods for determining average annual runoff from ungaged watersheds and the use of such runoff in the estimation of flow duration curves for hydropower feasibility studies. Methods included the use of precipitation-input maps, water yield maps, and regression equations utilizing basin characteristics. The various methods were tested on gaged and ungaged watersheds in Idaho and results compared with each other, as well as with actual flow measurements. The use of watershed characteristics such as mean basin elevation, cover density, and annual precipitation were tested and compared and it was found that precipitation alone provided the best and simplest approach for determining runoff.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号