首页> 美国政府科技报告 >Building Seals by Pneumatic Stowing in Mine Closure Operations
【24h】

Building Seals by Pneumatic Stowing in Mine Closure Operations

机译:通过气动装载在矿井关闭作业中建造密封件

获取原文

摘要

The Bureau of Mines, through a cooperative agreement with Duquesne Light Co. of Pennsylvania, field tested a method of using pneumatic stowing of crushed limestone to construct seals in long-abandoned mine openings that were part of an active mine closed shortly before sealing. A total of 13 openings at 11 sites were backfilled. In pneumatic stowing, material is conveyed through a pipeline and into the mine opening under low air pressure. The stowing equipment consists of a power supply, a blower, a feeder to inject material into the pipeline, and nozzle for directing the placement. Material is ejected from the nozzle at high velocity, creating a high-compaction fill upon impact.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号