首页> 美国政府科技报告 >Impact Assessment Report: C.P. Crane Steam Electric Station Aquatic Monitoring Program. Volume II. Appendices A-G
【24h】

Impact Assessment Report: C.P. Crane Steam Electric Station Aquatic Monitoring Program. Volume II. Appendices A-G

机译:影响评估报告:C.p。起重机蒸汽电站水上监测计划。第二卷。附录a-G

获取原文

摘要

This document is a summary of the results of a series of monitoring studies conducted by Baltimore Gas and Electric and the Maryland Power Plant Siting Program in the vicinity of the C.P. Crane Steam Electric Station between 1978-1980. Physical/chemical studies indicated that a considerable area within the discharge creeks (Saltpeter and Dundee) received plant discharge water with excess temperatures of 2C or greater and that the operation of the plant also slightly increased the salinity of the discharge creeks. Biological studies suggest that for the most trophic levels examined (e.g., phytoplankton, zooplankton, benthos, finfish), effects were limited to Saltpeter Creek and rarely extended into the Gunpowder River.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号