Water Project Construction Backlog. A Serious Problem with No Easy Solution

机译:水利工程施工积压。一个没有简单解决方案的严重问题

获取原文

摘要

The Army Corps of Engineers and the Bureau of Reclamation started fiscal year 1982 with 934 authorized water projects needing about $60 billion to complete construction. For fiscal year 1982, the Congress provided construction funds for 289 of these projects, but did not fund the remaining 645 projects needing about $24.5 billion to complete. About $21.9 billion had already been spent on the 289 funded projects. Another $35.5 billion--including an estimate for future inflation of corps projects--is needed to complete them. The backlog has grown in actual dollars because funding has not been sufficient to offset inflation and other cost increases. No easy answers exist for eliminating the construction backlog. However, this report discusses several alternatives which taken either singly or in combination could lessen it.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号