首页> 美国政府科技报告 >Procedure for Estimating Flow-Duration Curves for Ungaged Mountainous and High Plains Streams in Montana
【24h】

Procedure for Estimating Flow-Duration Curves for Ungaged Mountainous and High Plains Streams in Montana

机译:估算蒙大拿州未开垦的山地和高原流的流动持续时间曲线的程序

获取原文

摘要

A procedure for estimating shape and magnitude of flow-duration curves for ungaged stream locations in Montana has been developed. This procedure utilizes a dimensionless flow-duration curve which is determined based on streamflow records from a particular hydrologic region. The dimensionless curve is 'scaled' to an ungaged site using drainage area and mean annual precipitation as determined from suitable maps. Methodology requires that individual judgment be used in selecting flow-duration curve shape--especially if spring flow and/or regulation exist above the chosen site. Accuracy of this procedure will vary depending on the degree of hydrologic similarity between the ungaged site and the gaged streams used to develop dimensionless curves.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号