首页> 美国政府科技报告 >Western Maryland Power Plant Siting Study: Evaluation of Transmission Line Corridor Options
【24h】

Western Maryland Power Plant Siting Study: Evaluation of Transmission Line Corridor Options

机译:西马里兰电厂选址研究:输电线路走廊选择评估

获取原文

摘要

The objective of this study was to determine if one or more transmission line corridors exist between two candidate Western Maryland Power Plant sites in Washington County (WP-14, WP-26) and the Doubs Substation (approximately 30 miles to the southeast) which could accept a 200 feet wide ROW for a single circuit 500 kV line. Transmission corridor options were evaluated with regard to potential conflicts with existing and projected land uses, effects on cultural resources, aesthetic impacts, preliminary engineering considerations, costs, and use and maintenance of transmission line ROWs on soils, natural vegetation, agricultural activities, and aquatic and terrestrial wildlife.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号