首页> 美国政府科技报告 >Shipboard/Shoreside Computer Information and Management System, Phase 2. Preventive Maintenance and Machinery History. Final Report
【24h】

Shipboard/Shoreside Computer Information and Management System, Phase 2. Preventive Maintenance and Machinery History. Final Report

机译:船舶/岸边计算机信息和管理系统,第2阶段。预防性维护和机械历史。总结报告

获取原文

摘要

This is the final report on Contract No. DT-MA-91-82-C-20001 on the design, development and implementation of Phase II of a two-phase integrated shipboard/shoreside computer management information system. Phase II concerns Preventive Maintenance and Machinery History operating on shipboard/shoreside minicomputers. Phase I (Contract No. MA-80-SAC-01110) dealt with spare parts inventory control and ordering. The design of the system was based on computerization of the existing Shipboard Maintenance and Repair System (SMARS-MARAD Contract No. 7-38014) which was implemented aboard the M/V SUGAR ISLANDER in 1977. The present system utilizes a minicomputer aboard the ship and another minicomputer in the ship operator's office ashore. The shipboard computer is used to generate maintenance schedules based on calendar days and by engine hours, update maintenance performed and add to machinery history, enter planned maintenance items, review regulatory body inspection schedules, and send/receive data to/from office. The shoreside computer is used to update regulatory body inspections, review maintenance performed, send/receive data to/from ship, and generate numerous reports useful to management. Appraisal for the system thus far has been favorable. The system works well and has eliminated most of the time lag difficulties inherent in the 'SMARS'.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号