首页> 美国政府科技报告 >Reassessment of the Excess Capacity Issue
【24h】

Reassessment of the Excess Capacity Issue

机译:重新评估超额容量问题

获取原文

摘要

The purpose of the report is to reassess the 1984 Iowa generation reserve margin in view of allegations of data errors, model inaccuracies, and forecast uncertainties. The scope of the reassessment is as follows: (1) re-evaluate the '1984 Iowa Generating Reserve Margin' (IGRM) study utilizing the best available data and the EGEAS model; (2) check the sensitivity of the results to reasonable load forecasts which might have been made in 1978 and 1981--the time at which studies to build or defer Louisa were completed by the Iowa utilities.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号