Electric Transmission Line Costs and Construction Lead Times

机译:输电线路成本与施工线路时间

获取原文

摘要

The study was commissioned by the Office of Technology Assessment to determine the potential for constructing new electric transmission facilities as one strategic response to a long-term major oil supply disruption. The primary considerations for implementing such a strategy are the time required to build new facilities (including licensing and construction phases) and the cost construction. In performing the work a number of newly completed and proposed transmission lines were surveyed.