首页> 美国政府科技报告 >Processing In-Situ Oil Shale Retort Offgas with a Stretford Plant at Geokinetics
【24h】

Processing In-Situ Oil Shale Retort Offgas with a Stretford Plant at Geokinetics

机译:在地球动力学中用stretford工厂处理原位油页岩蒸馏尾气

获取原文

摘要

The paper discusses the use of EPA's transportable Stretford process pilot plant on a 700-acfm slipstream of in-situ shale oil retort offgas to investigate H2S removal efficiency and process compatibility. This was the fourth application of the pilot plant which had demonstrated a continuously improving performance. During this test, the pilot plant was operated first with a venturi contactor alone and then with the venturi followed in series by a packed tower contactor. With the venturi alone, the plant achieved 95% removal efficiency, but its average performance was lower. With the addition of the packed tower, the removal efficiency reached 99+%. Excessive foaming of the process solution was experienced which was attributed to the presence of organic aerosol in the retort offgas.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号