首页> 美国政府科技报告 >Long-Term Performance of Three Bridges on Permafrost
【24h】

Long-Term Performance of Three Bridges on Permafrost

机译:多年冻土区三座桥梁的长期性能

获取原文

摘要

In 1964 the Alaska Department of Transportation and the U.S. Army Cold Regions Research and Engineering Laboratory initiated a cooperative study which in the long-term generated a significant amount of ground temperature and settlement data at three bridge sites near Fairbanks, Alaska. The purpose of the study was to evaluate the long-term bridge performance in order to improve bridge design techniques in areas where permafrost is present. Data over the past 20 years has been reduced and evaluated revealing some drastic changes in the thermal regime. At the Goldstream Creek Bridge, settlements of approximately 6 in (15 cm) over a 10-year period were observed. At the Moose Creek Bridge, annual heave and subsidence with long term net uplifting has been measured. Differential settlements of more than 8 in (20 cm) and slight annual heaving have been measured at the Spinach Creek Bridge. The bridge analysis has demonstrated the hazards of relying on permafrost adfreeze bonding for support of piles located in streambeds in warm permafrost regions.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号