首页> 美国政府科技报告 >Analysis of Movements and Forces on Bridge Approaches: A Case Study (Bridge Over Chesapeake Avenue on Interstate 471 in Campbell County, Kentucky)
【24h】

Analysis of Movements and Forces on Bridge Approaches: A Case Study (Bridge Over Chesapeake Avenue on Interstate 471 in Campbell County, Kentucky)

机译:桥梁方法的运动和力量分析:一个案例研究(肯塔基州坎贝尔县471号州际公路上的切萨皮克大桥)

获取原文

摘要

A case study is presented of a bridge on Interstate 471 in Campbell County, Kentucky. The south approach to the bridge is a side-hill fill. During construction, the south intermediate piers tilted as a result of movement in the south approach foundation. Construction was temporarily halted on the south approach embankment, allowing pore pressures in the foundation to dissipate and slowing the movement. The piers were than reconstructed. The south approach end bents were instrumented with earth pressure meters. The piles were instrumented with slope inclinometers. Most recent data show that movement is continuing and the present factor of safety is approximately 1.03.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号