首页> 美国政府科技报告 >Impact of and Recovery from Sewage Sludge Dumping at the Philadelphia Dumpsite
【24h】

Impact of and Recovery from Sewage Sludge Dumping at the Philadelphia Dumpsite

机译:费城垃圾场污水污泥倾倒的影响和恢复

获取原文

摘要

The report reviews the results of studies of the Philadelphia Sewage Sludge dumpsite carried out between 1973 and 1984 by NOAA, EPA, and other organizations. The site, located on the continental shelf east of the Maryland coast, was used for the disposal of sewage sludge from Philadelphia between 1973 and 1980. Studies were carried out before, during and after dumping. A substantial number of studies were undertaken during dumping to attempt to identify and quantify impact. These included measurements of metals and total organic carbon in sediments and biota, analyses of impacts on the benthos, and microbial studies.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号