首页> 美国政府科技报告 >Performance of a Press-Lam Bridge: A 5-Year Load-Testing and Monitoring Program
【24h】

Performance of a Press-Lam Bridge: A 5-Year Load-Testing and Monitoring Program

机译:press-Lam大桥的性能:5年负载测试和监控计划

获取原文

摘要

The paper summarizes the results of load tests on an experimental highway bridge erected and put into service on the George Washington National Forest in Virginia in 1977. The bridge, made entirely of Press-Lam, a laminated veneer lumber (LVL) product, was load tested 1 month, 1 year, and 5 years after erection.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号