首页> 美国政府科技报告 >Blast Furnace Operation with Oxygen-Enriched Unheated Blast Air
【24h】

Blast Furnace Operation with Oxygen-Enriched Unheated Blast Air

机译:高氧未加热的高炉空气高炉操作

获取原文

摘要

Three trials with oxygen-enriched unheated blast air are described. The trials were conducted in the Bureau of Mines experimental blast furnace located in Bruceton, PA. For the first trial, moisture was added to the oxygenated blast. The second and third trials were conducted with natural gas injection. The test was basically a feasibility study; the practice was demonstrated to be feasible and also have possible advantages over hot blast operation. The testwork was conducted in 1964 and 1965 as part of a continuing study of ironmaking technology in cooperation with several North American steel companies.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号