首页> 美国政府科技报告 >Evaluation of Full-Scale Fabric Filters on Utility Boilers: PP and L Brunner Island Station Unit 1
【24h】

Evaluation of Full-Scale Fabric Filters on Utility Boilers: PP and L Brunner Island Station Unit 1

机译:电站锅炉全尺寸织物过滤器的评估:pp和L Brunner Island station 1号机组

获取原文

摘要

The report gives results of two series of total mass and fractional size particulate emission tests at Pennsylvania Power and Light's Brunner Island Station Unit 1 on August 12-16, 1981, and September 2-4, 1982, as part of a program to evaluate and characterize the performance of full-scale fabric filter units installed on 100 MW or larger coal-fired power plants. For 2 years, beginning at start-up of the fabric filter, strip charts and daily operation and maintenance records were reviewed and key data recorded. A discussion of bag life and pressure drop problems and attempted solutions is included.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号