首页> 美国政府科技报告 >Crumb Rubber Chip Seal East of Punkin Center
【24h】

Crumb Rubber Chip Seal East of Punkin Center

机译:punkin中心以东的Crumb Rubber Chip seal

获取原文

摘要

The project was initiated in March, 1978 to evaluate the performance of rubber-asphalt binders as chip seal materials in eastern Colorado. Documents the performance of rubber asphalt binders as chip seal materials. The test sections consisted of two rubber-asphalt binders, a rubberized cutback (RC-800, the standard chip seal at the time of construction), and a plain AC-10 chip seal. The rubber asphalt binders had performed as well as the rubberized RC-800; however, from an economic standpoint the rubberized RC-800 is recommended for use as a chip seal binder on low-volume highway.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号