首页> 美国政府科技报告 >Delayed Blasting Tests to Improve Highwall Stability-A Final Report
【24h】

Delayed Blasting Tests to Improve Highwall Stability-A Final Report

机译:延迟爆破试验以提高高墙稳定性 - 最终报告

获取原文

摘要

The Bureau of Mines conducted a series of delayed blasting experiments at a Barbour County, WV, contour coal mine that resulted in smoother highwalls. The highwalls were smoother due to reduced overbreak (excessive rock breakage beyond the excavation limit) and were inherently safer due to reduced likelihood of rockfall. The experiments were directed at reducing overbreak without special drilling or significant additional cost. Reduced overbreak was accomplished by increasing the highwall hole delays, which changed the effective delay pattern geometry and the direction of burden movement.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号