首页> 美国政府科技报告 >Surface Mine Reclamation at the Elkins Mine Drainage Demonstration Project After 17 Years
【24h】

Surface Mine Reclamation at the Elkins Mine Drainage Demonstration Project After 17 Years

机译:17年后埃尔金斯矿井排水示范项目的露天矿山填海工程

获取原文

摘要

In 1968 approximately 640 acres of land disturbed by coal mining were reclaimed and revegetated. The revegetation approach included the use of lime and fertilizer followed by seeding with a grass/legume mixture. In the steeper areas pine trees were also planted. In areas designated for forest planting, a mixture of pines and deciduous trees was utilized. The revegetated areas were evaluated in 1971, 1973, 1976, 1984, and 1985. The paper discusses the results of the latter two evaluations.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号