首页> 美国政府科技报告 >Economic Analysis of Artificial Recharge and Recovery of Water In Butler Valley, Arizona
【24h】

Economic Analysis of Artificial Recharge and Recovery of Water In Butler Valley, Arizona

机译:亚利桑那州巴特勒河谷人工补给和水回收的经济分析

获取原文

摘要

Costs per acre-foot of water artificially recharged and recovered are estimated in assessing the economic viability of conjunctive management of Butler Valley, Arizona and imported surface water delivered by the Central Arizona Project (CAP) aqueduct. Proposed artificial recharge methods include spreading basins, channel modification and recharge wells. Calculated recharge/recovery costs for selected plans range from $94 to $488, depending on discount rate, design period, and power rate. With the implementation of proper water-management strategies, preliminary results indicate that conjunctive management of Butler Valley and CAP water might offer potential benefits to municipalities, industry, and agriculture in Arizona.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号