首页> 美国政府科技报告 >Optimization of Left Turn Phase Sequence in Signalized Networks Using MAXBAND 86. Volume 3. Program Manual
【24h】

Optimization of Left Turn Phase Sequence in Signalized Networks Using MAXBAND 86. Volume 3. Program Manual

机译:使用maXBaND优化信号网络中的左转相序86.第3卷。程序手册

获取原文

摘要

MAXBAND has been enhanced to provide the capability of computing traffic signal timing plans for general grid networks, using bandwidth as a criterion. The revised program is more user friendly and has several new features. General grid networks as large as 20 x 20 can be solved. Phase sequence optimization is provided together with NEMA, eight-phase numbering. MAXBAND is written in FORTRAN 77. Volume 3, MAXBAND Programmer's Manual, gives detailed descriptions of the subroutines composing the MAXBAND program as developed using structured programming technology. Each description includes the purpose and function of the subroutine, how it is related to other subroutines, and the variables which it uses. Other than features which have been altered, no attempt is made to document the MPCODE Mathematical Programming System, portions of which are included in the MAXBAND program.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号