首页> 美国政府科技报告 >Repair of Earthquake Damaged Bridge Columns with Fractured Bars.
【24h】

Repair of Earthquake Damaged Bridge Columns with Fractured Bars.

机译:碎裂钢筋混凝土地震损伤桥梁的修复。

获取原文

摘要

The objective of this study is to repair three, half-scale RC bridge columns that will be tested to failure under slow cyclic loading. These columns will have fractured longitudinal and transverse steel. The ultimate goal is to develop repair methods for these columns using different techniques. In the first two columns, different Caltrans approved ultimate splices will be used, and in the third column, an enlarged section will be built in the plastic hinge area. The target performance for the repaired columns is to restore the lateral load and ductility capacity to the level that is comparable to that of the original columns.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号