首页> 美国政府科技报告 >Status of EPA's (Environmental Protection Agency's) LIMB (Limestone Injection Multistage Burner) Demonstration Program at Ohio Edison's Edgewater Unit 4
【24h】

Status of EPA's (Environmental Protection Agency's) LIMB (Limestone Injection Multistage Burner) Demonstration Program at Ohio Edison's Edgewater Unit 4

机译:环境保护局(环境保护局)的LImB(石灰石注入多级燃烧器)示范项目在俄亥俄州爱迪生的Edgewater Unit 4的现状

获取原文

摘要

The paper describes and discusses the key design features of the retrofit of EPA's Limestone Injection Multistage Burner (LIMB) system to an operating, wall-fired utility boiler at Ohio Edison's Edgewater Station. It further describes results of the pertinent projects in EPA's LIMB program and shows how these results were used as the basis for the design of the system. The full-scale demonstration is expected to prove the effectiveness and cost of the LIMB concept for use on large-scale utility boilers. The equipment is now being installed at Edgewater, with system start-up scheduled for May 1987.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号