首页> 美国政府科技报告 >Public Utility Commissioner Selection and Electric Utilities' Cost of Capital, Part 1: The Overall Cost of Capital. Final Report for 1986/87 SOMED Project
【24h】

Public Utility Commissioner Selection and Electric Utilities' Cost of Capital, Part 1: The Overall Cost of Capital. Final Report for 1986/87 SOMED Project

机译:公用事业专员选择和电力公用事业的资本成本,第1部分:资本的总体成本。 1986/87 sOmED项目的最终报告

获取原文

摘要

The objective of the project is to determine if the direct election of Public Utility Commissions (PUC's) has any effect on electric utilities cost of capital. The first part of the project is an analysis of the overall cost of capital of electric utilities. The authors use book-value-weighted average of the costs of short and long term debt and common and preferred equity for 1982. A random coefficient regression model is used to analyze the effects of political and financial variables on the overall cost of capital. Direct election of the PUC has no effect on this measure of the overall cost of capital.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号