首页> 美国政府科技报告 >Automatic Updating of Traffic Volume Data for Signal Timing Plan Development. Volume 1. Technical Report
【24h】

Automatic Updating of Traffic Volume Data for Signal Timing Plan Development. Volume 1. Technical Report

机译:信号配时规划开发中交通量数据的自动更新。第1卷。技术报告

获取原文

摘要

The purpose of the research was to test the validity of using automatically-collected traffic volumes from selected system detector sites to generate a full TRANSYT-7F data file for calculating signal network timing plans. Termed the 1.5 GC control concept, the approach assumes that volume shifts on selected links will accurately represent shifts throughout the network. Tests were run at two significantly different test sites and included several detector placement scenarios. Results from multiple TRANSYT runs for both test sites strongly suggest that the 1.5 GC approach as simulated in the research is a viable alternative to the labor-intensive conventional field data collection currently used to develop TRANSYT-7F volume data files. This allows more frequent updates of timing plans to meet changing traffic conditions.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号