Pillar Load Transfer Associated with Multiple-Seam Mining

机译:与多煤层开采相关的支柱荷载传递

获取原文

摘要

As part of a program to improve mine planning and development, the Bureau of Mines is investigating the effects of pillar load transfer which impacts on mining operations within a multiple-seam configuration. At two mine sites, the Bureau performed a complete geological analysis and installed and monitored instrumentation to gather pertinent data on rock mechanics. Overburden depth varied dramatically in the vicinity of the study area and reached a maximum at the study site; innerburden thickness was less than a pillar width (40 to 45 ft); heaving was experienced in both mines where sandstone and/or shale floor units were observed; overlays of the mine layouts show pillars were not totally superpositioned; a maximum of 5 in of roof to floor convergence was measured; and pressure readings indicated pillar core loading only and increased to a maximum of 7,000 psig over instrument setting pressure.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号