首页> 美国政府科技报告 >Comparative Study of Pillar Load Transfer Associated with Multiple-Seam Mining
【24h】

Comparative Study of Pillar Load Transfer Associated with Multiple-Seam Mining

机译:多煤层开采伴柱荷载传递的对比研究

获取原文

摘要

The Bureau of Mines, is currently investigating the effects of pillar load transfer, which can impact mining operations within a multiple-seam configuration. A comparative study was performed at two separate mine sites. The objective of the study was to compare two mines, each affected by the pillar load transfer mechanism, and to show how this interaction affected underground workings by the installing and monitoring underground instrumentation. At mine site A where the overburden was 1,000 ft, the innerburden thickness was less than a pillar width (40 to 45 ft), overlays of the mine layout show pillars were not superpositioned, excessive roof to floor convergence was measured, and pressure readings indicated pillar core loading only. At mine site B, the overburden was approximately 555 ft, the innerburden thickness was approximately 105 ft, overlays of the mine layout show pillars were superpositioned, minimal roof to floor convergence was measured, and pressure readings indicated a skin loading only.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号