Feasibility Study for Retrofitting/Repowering of Unit 2, Station A at Kosovo, (EPK) Yugoslavia: Scope of Work and Detailed Cost Estimate.

机译:科索沃a区2号机组改造/重新供电的可行性研究(EpK)南斯拉夫:工作范围和详细费用估算。

获取原文

摘要

The primary objective of the feasibility study is to examine the life extension of the existing Unit 2 at Station A of the Electric Power Company of Kosovo (EPK). The study will consider state-of-the-art fluidized bed combustion boiler technology along with revitalization and retrofitting of the existing boiler with conventonal environmental controls for reduction of sulfur and particulate emissions. in addition, the study will include the examination of the rest of the power plant equipment for refurbishment and/or replacement.