首页> 美国政府科技报告 >Electric Power Resource Planning for Potomac Electric Power Company
【24h】

Electric Power Resource Planning for Potomac Electric Power Company

机译:波托马克电力公司电力资源规划

获取原文

摘要

The report analyzes the Potomac Electric Power Company's (PEPCO) need and appropriate scheduling for their next proposed generating unit, Station H. In addition it evaluates whether or not the gasification combined cycle (GCC) technology is the most economically attractive technology for Station H and whether or not demand-side management programs (DSM) have been appropriately incorporated into PEPCO's planning process. The economic merit of generation options was evaluated by estimating the cumulative present worth increment revenue requirements (CPWIRR) for various candidate generation expansion plans. Residential DSM programs were evaluated primarily by comparing PEPCO's programs and analysis results with research conducted in this area by the Power Plant and Environmental Review Division (PPER). The study concluded that there is a need for Station H on approximately the schedule proposed by PEPCO.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号