首页> 美国政府科技报告 >Traffic Control for Short Duration and Stop-and-Go Maintenance Operations on Four-Lane Divided Roadways
【24h】

Traffic Control for Short Duration and Stop-and-Go Maintenance Operations on Four-Lane Divided Roadways

机译:四车道分道车道短时停车和走走停停维修作业的交通管制

获取原文

摘要

The report summarizes the results of research conducted to develop and evaluate reduced traffic control set-ups for short duration and stop-and-go maintenance operations on four-lane, divided highways. Several candidate signing treatments were developed and compared to the standard Texas Manual On Uniform Traffic Control Devices (TMUTCD). Comparisons were made of (1) the effect of the signing treatments on where drivers exited the closed lane and (2) the manpower and time requirements for the set-up and removal. Study results indicate that a changeable message sign or a Texas 'LANE BLOCKED' sign placed 1500 ft before the cone taper results in drivers exiting the closed lane farther upstream than other signing treatments or the TMUTCD treatment. Studies of the set-up and removal times for the TMUTCD and the 'LANE BLOCKED' treatments show that the 'LANE BLOCKED' treatment requires significantly less time to install and remove than the TMUTCD treatment.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号