首页> 美国政府科技报告 >Recovery of Cobalt from Spent Copper Leach Solutions-Improved Elution and Impurity Removal Techniques, with Revised Process Economics
【24h】

Recovery of Cobalt from Spent Copper Leach Solutions-Improved Elution and Impurity Removal Techniques, with Revised Process Economics

机译:从废铜浸出液中回收钴 - 改进的洗脱和杂质去除技术,修订过程经济学

获取原文

摘要

The Bureau of Mines developed a process using ion exchange to recover cobalt from spent copper leach solutions. A preliminary economic evaluation of the process indicated that about one-third of the capital cost was attributed to the total resin inventory, and one-third of the operating cost was required for reagents to remove iron from the ion-exchange eluates. An agitated Pachuca elution system was investigated in place of a fixed-bed elution system. The Pachuca system reduced the resin inventory by 27% when compared with the fixed-bed elution system. Processing fresh spent copper leach solution reduced the resin inventory by 20% and resin iron loading by 80%. Reagent requirements for removing iron from the eluates were decreased because less iron was extracted. The Pachuca system, along with processing fresh spent copper leach solution, reduced the total resin inventory by 47%. A revised cost evaluation of the cobalt recovery process was obtained to determine the effects of these process modifications. The estimated total capital cost for a plant processing 10,000 ppm of spent copper leach solution containing 26 ppm Co was $23.1 million. With credits for nickel, zinc, and copper byproducts, the estimated net operating cost was $5.10/lb of cobalt.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号