首页> 美国政府科技报告 >Gas Pipeline Safety: Guidance and More Information Needed before Using Risk-Based Reassessment Intervals.
【24h】

Gas Pipeline Safety: Guidance and More Information Needed before Using Risk-Based Reassessment Intervals.

机译:天然气管道安全:在使用基于风险的重新评估间隔之前需要指导和更多信息。

获取原文

摘要

About 300,000 miles of gas transmission pipelines cross the United States, carrying natural gas from processing facilities to communities and large-volume users. These pipelines are largely regulated by PHMSA. The Pipeline Safety Improvement Act of 2002 established the gas integrity management program, which required gas transmission pipeline operators to assess the integrity of their pipeline segments in high consequence areas by December 2012 and reassess them at least every 7 years. The Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011 directed GAO to examine the results of these baseline assessments and reassessments and the potential impact of making the current process more risk-based. GAO analyzed (1) PHMSAs assessment data on repairs made and the appropriateness of the 7-year reassessment requirement, (2) the impact of the 7-year reassessment requirement on regulators and operators, and (3) the potential challenges of implementing risk-based reassessment intervals beyond 7 years. GAO analyzed assessment data; reviewed legislation and regulations; and interviewed pipeline operators, federal and state regulators, and other stakeholders.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号