首页> 美国政府科技报告 >Burlington Northern Railroad Overcrossing Bridge, Microsilica Modified Concrete Overlay. Bridge No. 5/718W. Post Construction Report
【24h】

Burlington Northern Railroad Overcrossing Bridge, Microsilica Modified Concrete Overlay. Bridge No. 5/718W. Post Construction Report

机译:伯灵顿北部铁路Overcrossing桥梁,microsilica修改过的混凝土覆盖物。 5号/ 718W号桥。施工后报告

获取原文

摘要

Washington State has approximately 700 bridge decks that may require a latex modified concrete (LMC) overlay in the next 12 to 15 years. The microsilica concrete overlay is seen as a possible alternative to the increasingly expensive latex modified concrete. A microsilica modified concrete overlay was placed on Bridge 5/718W in Skagit County. The bridge is a concrete box girder structure with 8,100 square feet of deck area. The ADT on this bridge is 9,150 vehicles per day. The minimum overlay thickness was 1 1/2 inches. Superplasticizer was added to the mix. The concrete was mixed in a conventional batch plant with the technical representative from the microsilica supplier providing assistance. The microsilica modified concrete overlay was finished and cured as prescribed by WSDOT's specification for LMC overlays.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号