首页> 美国政府科技报告 >Public Works Management Automation Facilities Engineering Job Estimating Module. Unit Price Standards Submodule. Users Manual Written for Zenith-248. Version 2.2
【24h】

Public Works Management Automation Facilities Engineering Job Estimating Module. Unit Price Standards Submodule. Users Manual Written for Zenith-248. Version 2.2

机译:公共工程管理自动化设施工程工作估算模块。单价标准子模块。用户手册为Zenith-248编写。版本2.2

获取原文

摘要

The Unit Price Standards (UPS) is a submodule of the Facilities Engineering Job Estimating (FEJE) Module. The UPS Submodule is an automated version of the Scoping Estimates procedure previously used. The UPS Submodule is designed to provide Planners and Estimators (P&E) and Facilities Inspectors with an improved capability to provide realistic, consistent, and timely estimates of the labor, material, and special equipment requirements, and costs involved in the maintenance and repair of real property. The three main sections in the UPS Submodule are: Job Directory; (UPS) Handbook; and Local Scoping Standards Handbook. Within this module, the user may scope an active directory, scope a history directory, view the UPS craft handbooks, and purge scoping active to history. If a job directory is chosen, the user may request the job directory list sorted in one of the following ways: by WP number sequence; all existing jobs for a particular building or facility; all existing jobs relating to a particular customer identification; all existing jobs according to a specified job creation date; or all existing jobs relating to a particular P&E.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号