Frost Heave Control with Buried Insulation

机译:埋地保温霜冻控制

获取原文

摘要

To investigate the effectiveness of extruded insulation panels in the mitigation of frost heave problems, two sites were selected: SH 40 at Rabbit Ears Pass with an elevation of 9,000 feet and I-70 east of Eisenhower Tunnel at an elevation of 10,000 feet. Temperature probes were installed in both sites in the control and the insulated sections. Hourly temperature variations were monitored and recorded by a micrologger and a tape recorder. The probes under the insulated area showed a warmer temperature (by approximately 7 degrees) and much less fluctuations than the probes installed in the control sections. The results of the study have demonstrated that insulation panels, if installed properly, can be a cost effective alternative to sub-excavation and backfilling.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号