首页> 美国政府科技报告 >Sawed Joints in AC Pavement
【24h】

Sawed Joints in AC Pavement

机译:aC路面锯缝

获取原文

摘要

The objective of the study was to evaluate the effectiveness of sawing controlled joints into a new asphalt surface. These sawed joints were located over existing transverse cracks which had developed in the old asphalt mat. Because there are no known treatments which prevent the eventual reflection of the existing cracks it was hoped the sawed joint would produce a straight, neat joint in the overlay. After the four year evaluation period it was determined that reflective cracking was not being controlled by the saw cut and in some cases the sawed joint was cause of additional deterioration of the pavement surface.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号