首页> 美国政府科技报告 >Framework for Real-Time Decision-Making: New Bedford Harbor Pilot Dredging Study
【24h】

Framework for Real-Time Decision-Making: New Bedford Harbor Pilot Dredging Study

机译:实时决策框架:新贝德福德港试点疏浚研究

获取原文

摘要

New Bedford Harbor is located along Buzzards Bay between the cities of New Bedford and Fairhaven, Mass. Since the 1940s, electronics and manufacturing companies in the area have discharged effluents containing polychlorinated biphenyls (PCBs) into the Acushnet River and the harbor. Over the past 15 years, nearly 18,000 acres of PCB- and heavy metals-contaminated sediment have been identified, with PCB concentrations as high as 100,000 parts per million (ppm) in some areas of the upper harbor. In 1982, the site was added to the Environmental Protection Agency's (EPA) National Priorities List of hazardous waste sites slated for cleanup under the Superfund Act. A feasibility study conducted by EPA in 1984 proposed several alternatives for the remediation of NBH including dredging contaminated sediments out of the harbor. Federal, State, and local officials, as well as the public, expressed concern over dredging. Many believed that sediments resuspended during dredging would cause the release of contaminants that would affect biota inhabiting both the harbor and Buzzards Bay. Others cited potential pollution problems from contaminated water (leachate) leaking from the proposed disposal site. In order to address these concerns, the EPA decided to pre-test dredging and possible disposal options.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号