首页> 美国政府科技报告 >Unaccounted-for Gas Project. Measurement Task Force (Orifice Meter Studies). Volume 2B
【24h】

Unaccounted-for Gas Project. Measurement Task Force (Orifice Meter Studies). Volume 2B

机译:无法计算的天然气项目。测量任务组(孔板仪表研究)。第2B卷

获取原文

摘要

The study was aimed at determining unaccounted-for (UAF) gas volumes resulting from operating Pacific Gas and Electric Co.'s transmission and distribution systems during 1987. Activities and methods are described and results are presented for research conducted on orifice meter accuracy. The Measurement Task Force determined that orifice metering inaccuracies were the largest single contributor to 1987 UAF.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号