首页> 美国政府科技报告 >Evaluation of Traffic Control Devices, Year 4.
【24h】

Evaluation of Traffic Control Devices, Year 4.

机译:交通控制设备评估,4年级。

获取原文

摘要

This project was established to provide a means of conducting small scale research activities on an as-needed basis so that the results could be available within months of starting the specific research. This report summarizes the research activities that were conducted between September 2011 and August 2012. The research included two primary activities and two secondary activities. The two primary activities were: (1) Rural Intersection Sign Reduction Evaluation, and (2) Update on Sequential Dynamic Curve Warning System Research. The two secondary activities were: (1) Development of Hurricane Evacuation Animation Maps for CRP, and (2) Mobile Pavement Marking Retroreflectivity Data Training.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号