首页> 美国政府科技报告 >Evaluation of Causes of Excessive Settlements of Pavements Behind BridgeAbutments and Their Remedies. Phase 2. Executive Summary
【24h】

Evaluation of Causes of Excessive Settlements of Pavements Behind BridgeAbutments and Their Remedies. Phase 2. Executive Summary

机译:桥梁背后路面过度沉降原因评价及补救措施。第2阶段。执行摘要

获取原文

摘要

To evaluate the causes of bridge approach settlement a survey of 758 bridgeapproaches in seventy-seven counties of Oklahoma was conducted. In the survey, data related to the following items were collected: (1) bridge, abutment, approach, and slope protection structure; (2) embankment material. Information related to the construction and maintenance for these approaches was collected by interviewing ODOT personnel and searching records maintained at ODOT. The analyses of data show that the settlement problem is extensive in Oklahoma, namely, 83% of the approaches surveyed experienced settlement. It was observed that on the basis of long term performance rigid and flexible approaches are similar, but on a short term basis, rigid approaches experience lower differential settlement. Pile supported abutments as compared to stub type and high embankments with no drainage for the fills appear to be conducive to larger settlements. In general, skewed approaches have a higher settlement than nonskewed approaches. Regression techniques were used to develop an empirical relationship between the approach settlement and the causative parameters such as age of the approach, embankment height, traffic volume, and skewness of the approach.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号