首页> 美国政府科技报告 >Field Evaluation of Bridge Deck Cathodic Protection Strip System with LatexModified Concrete Overlay
【24h】

Field Evaluation of Bridge Deck Cathodic Protection Strip System with LatexModified Concrete Overlay

机译:添加到阅览室阅读软件下载与<<具有乳胶改性混凝土覆盖层的桥面阴极保护条系统现场评价>>

获取原文

摘要

The report covers the construction phase of Cathodic Protection System on S.R.0028 section 61M of State Route 28, in Millvale Borough, Allegheny County. The report discusses the installation of the Cathodic Protection System, preparation of the deck, construction procedures, cost, specifications, etc. No problems occurred during the construction.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号